在線(xiàn)咨詢(xún)0379-67399999

                Installation

                發(fā)布時(shí)間:2006-12-09 15:47:33
                免費獲取報價(jià) 0379-6739 9999

                The equipment after assembly is provided by manufacturer and check shall be carried out as soon as receiving product in order to avoid possible troubles during transportation.

                1. It is suggested to install the equipment on concrete base to decrease vibration, noise and absorption of shock in order to avoid impact on building base. Adding ironwood, rubber belt or other buffer materials may as well.

                2. Weight of base can be determined at 5-10 times of that of equipment and the depth of base shall be more than that of local frozen earth. Refer to the Base figure for locations of installing equipment and foundation bolt.

                3. Before adjusting discharge door, release strain spring, and then adjust spring in order to prevent drop of ancon plate.

                Leave a message

                在線(xiàn)留言

                免費提供設備報價(jià)、方案設計等服務(wù),歡迎您隨時(shí)咨詢(xún)我們將第一時(shí)間給予回復!

                我們會(huì )對您的個(gè)人隱私信息保密,請您放心!

                0379-67399999

                免費詢(xún)價(jià)

                服務(wù)熱線(xiàn) 0379-6739 9999

                獲取參數表 領(lǐng)取優(yōu)惠報價(jià) 預約實(shí)地考察 免費量身定制方案
                亚洲h片在线观看播放|久久夜亚洲业亚洲女6久女6久|四虎国产精品视频免费看麻豆|精品无码国产一区二区二百信息网|日韩久久精品无码一二级|99er爱热在线视频|精品欧洲av无码一区二区三区